banner
Home » Knowledge » Content
Product Categories

Essentials of Automatic door installation

- Sep 28, 2017 -

1. If the automatic gate track is installed on the welded iron keel frame, the whole skeleton material of the automatic door should use a square iron pipe with a wall thickness of more than 3 mm, or other material that is fairly (or better).

2, Automatic door skeleton installation, please ensure that the overall skeleton level, vertical, firm, tightly solid. The surface of the installation track should be smooth without burr, to ensure that the aluminum alloy track installed on the horizontal vertical, firm. Please use the horizontal pipe level when installing.

3, automatic door such as installed on the load-bearing wall or really his attachment, to ensure that the aluminum alloy track installed on the horizontal vertical, firm. Please install the level of horizontal tube.

4, the installation of the automatic door stop is installed after the door body is installed, the stop pendulum must be firmly installed with the ground, long-term use is not loose.

5, if the use of our company no frame automatic door clamp, please be sure to use the matching screw cover, leather

6, the probe installation must ensure that after the installation stability does not shake. (in connection with the thickness of the gusset plate and the installation, the thickness of the stainless steel sheet and the precision of the installation are related to the operating noise of the automatic door).